Perform optical design and simulation according to the optical requirements, LED models, and optical device size requirements provided by customers; provide design reports and optical solutions.
Period: 1-5 days
Based on the optical design, product structure design, mold design, and mold flow analysis are carried out based on product installation and industrial appearance requirements.
Period: 1-5 days
In order to achieve the optical effect, use precision machine tools to process molds
General mold processing time: 20-35 days
Test mold (soft mold): 5-10 days
According to the optical requirements, LED models, and optical device requirements provided by customers, optical design and simulation are performed; design reports and optical solutions are provided.